Description
Mini GPS Car Tracker for Enhanced Vehicle Security
The Mini GPS Car Tracker offers reliable and secure tracking for your vehicle. With its magnetic attachment, this tracker can be placed anywhere, ensuring consistent protection against theft. Enjoy peace of mind with its interference-resistant signals and straightforward setup.
Why You'll Love It
- Magnetic Attachment: Easy to install anywhere on your vehicle for reliable tracking.
- Interference-Resistant Signals: Ensures consistent tracking even in challenging environments.
- Real-Time Monitoring: Access live location updates through the companion app.
- Voice Activation: Call the SIM card for live audio monitoring.
- No Hidden Fees: Transparent pricing with no additional costs for tracking services.
Specifications
- Size: 4 x 2.5 x 1.5 cm / 1.57 x 0.98 x 0.59 in
- SIM Card: 2G SIM card, mini TF (Not Included)
- Material: ABS
- Talking Time: 150-180 minutes
- Standby Time: 180 days
- Working Time: 4-6 days
- Network: GSM / GPRS
- GSM Band: 850/900/1800/1900 MHz
- Positioning Time: 25 seconds
- Power: 5V 300-500mA
- Battery: 3.7V 400 mA lithium-ion battery (rechargeable)
- Waterproof Design: Integrated magnet for easy installation without extra accessories.